Air-Gapped Deployment.

For businesses whose infrastructure is offline by design. Everything in the private deployment, plus the offline install and update procedure, the dependency mirror, the isolation validation, the audit evidence pack, the disaster recovery procedure, and on-site commissioning.

Outcomes

What changes when the engagement lands.

Sovereign AI operating offline

The full private stack running in an air-gapped environment. No external dependencies.

Update path preserved

Offline install and update procedure documented and rehearsed. The stack doesn't rot.

Isolation validated

Third-party validation that the environment is genuinely isolated. Evidence for the audit pack.

DR tested, not assumed

Disaster recovery procedure exercised. Recovery time and recovery point measured.

Deliverables

What's in the engagement.

Private LLM deployment on air-gapped infrastructure. Everything in P8, plus offline install and update procedures, dependency mirroring, isolation validation, audit evidence pack, disaster recovery procedure, and on-site commissioning.

Air-gapped inference stack

The stack deployed on isolated infrastructure. Fully functional offline.

Dependency mirror

All dependencies mirrored and version-locked. Updates delivered through a controlled procedure.

Isolation validation

Independent verification that the environment is isolated. Documented evidence.

Audit evidence pack

Comprehensive evidence package for regulatory and internal audit.

DR procedure

Documented, tested disaster recovery procedure. Measured RTO and RPO.

How we deliver

Fixed scope. Named phases. Duration on the cover.

The engagement is priced against the outcome, not open-ended hours. Every phase has a duration, a named deliverable, and a check-out.

Total duration3 to 6 months

Sales cycle12 to 24 weeks

  1. 014 to 8 weeks

    Hardware and site prep

    Coordination with hardware partner. Site preparation. Isolation design.

  2. 026 to 10 weeks

    Deployment

    Stack deployed. Dependencies mirrored. Configuration hardened.

  3. 032 to 4 weeks

    Validation and DR

    Isolation validated. DR procedure exercised. Audit evidence assembled.

  4. 042 weeks

    Commissioning and handover

    On-site commissioning. Team training. Sign-off.

Built for

Buyers this engagement fits.

Typical buyer

CIO, CISO, Head of Sovereign Infrastructure

  • Sovereign infrastructure programmes

    The mandate calls for air-gapped operation. This is the delivery.

  • Defence and critical-infrastructure operators

    The environment is offline by design. AI has to work in it. This is how.

Talk to us.

45 minutes on your operation and the engagement you have in mind. No pitch, no deck.

Emailhello@plaith.io

ResponseWithin one business day

ReferenceService code P9

By briefing only

This engagement is scoped one to one.

This service is delivered with a hardware or platform partner and is scoped against a specific mandate. Every engagement starts with a direct conversation, not an open form. Email us and we'll route the enquiry to the right lead.